Sunday, 22 July 2012

How to learn from the past

Today, quite by accident, I came across a paper published by the Institution of Civil Engineers in 2006, "The importance of learning from past experience" by Dr. Trevor Asher Kletz. It seems to me to be so relevant to the railway industry that I offer a summary of some of his advice below. The first one I've selected is so important I think it should be written into the rule book:
  • "Never remove equipment or abandon procedures before it is discovered why they were introduced". This is so obvious and so often neglected that no further comment from me is necessary. 
  • "Include a note on the reason why for every instruction, code and standard..." Although he doesn't say so, I'm sure he expects that the note should be part of the standard, not separated off in the dreaded "guidance notes". 
  • For each process, there should be a folder of reports on past accidents, and that these should be compulsory reading for new recruits. 
Dr Kletz goes on to say that past major incidents should be included in the training of undergraduates and company employees. "The training," he says, "should start with accounts of accidents that demonstrate the need for codes, standards or instructions."
There is more, some of which is obvious, but the paper is worth reading in its own right. It can be found here:  Proceedings of the Institution of Civil Engineers – Civil Engineering, 2006, 161, No. CE6.

Wednesday, 2 May 2012

Train Refurbishment

If you are thinking about refurbishing your rolling stock, here some valuable lessons, learned through bitter experience:
  • Always have a clear and fixed remit agreed with the operators before going ahead with the design;
  • Never assume new stuff will fit into all the old trains. Even if it is specially designed, it probably won’t;
  • Avoid messing with wiring unless you strip it all out and replace it;
  • Every train/vehicle should be jointly tested and surveyed before acceptance by the contractor. All defects to be noted and agreed by both parties for inclusion in the work (or not) as required;
  • Always assume you will find things you didn’t expect when you strip – you will, sometimes even when you're getting near the end of the job;
  • Always expect things that are not supposed to be touched will be and will get damaged as a result;
  • Always allow a long learning curve for the first few trains;
  • Avoid changes in design or requirements mid-contract. It will be very expensive;
  • Have some your own experienced staff working with the contractor’s team, on site, for the full duration of the contract, including the design phase. They can offer valuable help, build up a rapport with the contractor and keep an eye on things;
  • Upon completion, jointly check and test every vehicle and then couple into a train and test again before acceptance;
  • Always expect it to cost more than you estimated;
  • Always expect it to take longer than you estimated;
  • Don’t go for the lowest bid because it’s the lowest. It will cost more in the end;
  • Work with your contractor rather than against him. Openness and co-operation will be cheaper for both of you.
There are certainly more lessons I could add but these are the most pertinent. I offer these because, almost 20 years after I was first involved in train refurbishment, these mistakes are still being made. I heard recently that, a year into a 2010 train refurbishment project, all the above lessons had been ignored, the contractor was forced into bankruptcy and the operator was left with a huge bill and a partly refurbished fleet that he now has to re-tender for, so he can get it all working again.

Saturday, 3 March 2012

A Wrong Turn

A lady driver, aged 85, took a wrong turn at a level crossing at Basingstoke in England on January 26th  2012, when she drove onto the railway track and drove for 80 metres before she realised something wasn't quite right. She had a 20 year old male in the car with her. Apparently she was looking for the station car parking area. She's lucky she and the car didn't light up the area by touching the electric conductor rail that the line has.

One has to wonder how someone who can do that kind of thing has survived to that age. And as for her passenger, where was his brain.  Perhaps it was a family member....

Of course the railway was shut down for two hours and thousands of passengers had their journeys disrupted while the mess was sorted out.  I hope she will be prosecuted for endangering the lives of railway passengers.

Thursday, 1 March 2012

More Railway Contracts in Saudi Arabia


The Arab News reports that Finance Minister, Ibrahim Al-Assaf, on Saturday 25th February 2012 signed three contacts worth SR2.34 billion with Saudi Arabian Railway (SAR) to implement a number of projects related to the North-South Railway. Starting from Riyadh, the 2,750-km railway reaches up to the northern border town of Hudaitha passing by Sudair, Qassim, Hail and Al-Jouf. It also links the phosphate and bauxite mines in Jelamaid and Baitha with industrial plants in Ras Al-Khair, Jubail and Dammam. 

The new contracts were signed to establish five passenger stations, a maintenance complex in Naeeriya, 36 remote maintenance workshops, plus a technical support office and housing units for maintenance staff. Al-Rashid Trading & Contracting won the first contract worth SR1.57 billion to establish five passenger stations in Majmaa, Qassim, Hail, Al-Jouf and Qurayat. Each station will cost SR314.4 million. It is said that the project will be completed in an ambitious 24 months. 

The SR495.7 million maintenance complex project was won by Yabi Markazi Co., and an official statement carried by the Saudi Press Agency said that it would be completed within 18 months. It will provide maintenance for locomotives and carriages as well as for track. The project includes fuel supply depots. 

Sulaiman Al-Qudaibi & Sons won a third contract valued at SR271.58 million to establish 36 small maintenance workshops along the railway including 15 for the maintenance of track and communication systems, 11 hostels to house workers and eight administrative buildings. Speaking to reporters after the signing ceremony, Al-Assaf said the North-South Railway project was progressing well. “Last year we conducted experimental operation of the railway for transporting phosphate from Jelamaid to Ras Al-Khair,” he said, adding that it can transport up to 12,500 tons of phosphate in one trip. 

The government has given priority to the North-South Railway considering its role in industrial development. It would ferry minerals from mines in the north and central zones at Jelamaid and Zubairah to processing plants at Ras Al-Khair in the east. Sponsored by the Public Investment Fund, the rail line is integral to planned phosphate and bauxite mining projects in the north of the country that will link up with processing plants and smelters on the Gulf coast. It is of strategic importance to the national economy as the processing of phosphates, which exists in commercial quantities, will place the Kingdom second internationally in exports of the mineral, besides accommodating fertilizer industry technology. It will also increase oil, agricultural and industrial products transportation, as well as goods and passengers.

It is interesting that Saudi Arabia has led the railway development programme in the Middle East. They are only too well aware of the limitations of their oil reserves and they know that, eventually, it will dry up. Positioning themselves for the Kingdom's future development, post oil, they are looking to ore mining and processing as one of the replacement industries.  The building of the railway to get the ore from the mines in the north to the ports in the south east has been a priority for the government over that last few years. 

Tuesday, 24 January 2012

New Train Testing Time

In an article I'm writing for Underground News, I note some facts on train testing times. In 1938, it took six weeks from delivery of the first unit of new stock to entry into passenger service.  For the Victoria Line's 1967 Tube Stock, the same process took 5 months and, for its new 2009 Tube Stock, it has taken 20 months.  At the same rates, for the next tube stock for the Victoria Line, due in the year 2050, it will take 6½ years to get the testing done. This is longer than it took to build and deliver into service the whole fleet of 1967 Tube Stock. Are we so unsure of our engineering that we have to waste so much time checking it?

Tuesday, 17 January 2012

Weekend Closures not Unique to UK

They have weekend Subway closures in New York City too. This from Railway Track & Structures:


A continuation of upgrade and modernization work to the New York Metropolitan Transportation Authority's Flushing Line and its stations will necessitate suspension of 7 train service between Queensboro Plaza (in Queens, N.Y.) and Times Square in Manhattan for 11 weekends beginning Jan. 21, as well as the full closure of the Court Square Station on the 7 line until April 2. 

I used to live in Sunnyside near the 46th St-Bliss station.  I wonder how I'd get into the city. I expect there's a bus. No? Oh well, I'll take a cab.


Monday, 16 January 2012

What Shall We Do With HS2?

I've always been firmly on the fence about this HS2 business. I see the need for additional capacity in Britain's rail network but it's how we should provide it that perplexes me. Should we build new lines like HS2, or add tracks to existing routes?

There are two problems to consider - cost and results.  If you take HS1 as a guide, HS2 will cost around £50million a kilometre. If you look at the Trent Valley route widening, extra tracks there cost around £18million per kilometre. A no-brainer in favour of extra tracks surely? Well, not necessarily.

Extra tracks along an existing route will be difficult to install without long shutdowns and some areas, like Birmingham New Street, would involve a disproportionate level of expenditure and disruption to expand to cope with 60 years of increasing traffic.

Then there is maintenance. What the railways in Britain desperately need is alternative routes to allow diversions during maintenance works.  The lack of these, in today's excessively risk averse, "elf & safety" culture, leads to long shutdowns for relatively simple works. The commercial nature of such works adds to the disruption and to the costs. Extra tracks will not give us the diversions we need. Any maintenance work will cause even more disruption.

On the other hand, the Nimbys in the Chilterns have a point in their battle against HS2.  The area is well known as the suburbia of the rich and powerful - people who never, or rarely, use trains. How do they know what it's like to travel in a crowded train full of students, football fans and families with small, screaming children? How do they know what it's like to stand for 40 minutes every day to and from work? Why would they want to see their property values reduced without compensation? Of course they wouldn't. Would you? Be aware that their obstinance and power will push up the costs and extend the time taken to build HS2 - if it ever gets built.

Then there's the economic assessment.  If the whole HS2 business case is based on more than about 12 trains per hour, it must be questionable. No other HS route in the world does better than that at 300+ km/h.  If it is based on reduced journey time, the usual argument for new rail projects, it must be ranged against the resulting increase in energy consumption and the closeness of station stops planned for the HS2 route.  The minimum distance between HS stops should be at least 200km to make it truly cost effective.

But, what about HS1 as a comparison?  Despite 10 years of shilly-shallying and protests by locals, the line was built, on time and within budget and the countryside of Kent hardly noticed. Indeed now, it has blended into its surroundings and nature has healed the small wounds and cuts it suffered during construction. It works and it's helping to restore East Kent economically.

All in all, I'm still on the fence.  I'd like to see a much more rigorous assessment of the HS2 vs existing expansion case. None of the stuff I've read, especially from HS2, seems to be clear or realistic.  Memo to Government and HS2: Do again, otherwise you'll look silly at the public enquiries that are bound to follow.