In the days of guard door operation on the London Underground (finally abolished in 2000), there was no interlocking of doors with train movement. Doors could be opened while the train was moving. They weren’t of course (usually) but the facility was used to speed up station operation. The experienced guard knew that there was always going to be a lag between the train wheels stopping and the doors opening fully and he knew also that station stop time had to be kept to a minimum. To keep dwell time short, the guard would press the door open buttons a second or two before the train stopped so that the doors were beginning to open at wheel stop. Valuable seconds were saved and no one got hurt. So, why can't we replicate this in an automated system?
A WINDOW ON THE WORLD OF RAILWAY SYSTEMS, TECHNOLOGIES AND OPERATIONS
Sunday, 25 October 2026
Are standards for the railway too rigid?
In the days of guard door operation on the London Underground (finally abolished in 2000), there was no interlocking of doors with train movement. Doors could be opened while the train was moving. They weren’t of course (usually) but the facility was used to speed up station operation. The experienced guard knew that there was always going to be a lag between the train wheels stopping and the doors opening fully and he knew also that station stop time had to be kept to a minimum. To keep dwell time short, the guard would press the door open buttons a second or two before the train stopped so that the doors were beginning to open at wheel stop. Valuable seconds were saved and no one got hurt. So, why can't we replicate this in an automated system?
Timetables and Control - Thameslink Case Study
Silence is Broken
Back in the Summer of 2018, I watched the continued disruption to the train services operated by Govia Thameslink Railway (GTR) with dismay and despair. I thought, after three weeks of operation following the introduction of a new timetable in May 2018, they would have got it sorted out, at least to a level where some sort of regular and reliable train service could be operated. But they haven’t. There we were, in the 6th week of the new timetable and there were still serious problems with the train service.Why three weeks to get it sorted? Because, if you consider the average 24-hour shift pattern of early, late and nights, spread over three weeks of operations, it should allow most of the core staff to get used to the new pattern of services, the new train crew duties and the new routes. But it hasn’t happened like that.
Silence
I’ve stayed silent for a while as I thought I couldn’t add anything useful to the huge range of complaints, blame, calls for the stripping of “franchises” and largely uninformed nonsense from the popular press and social media. In vain, I waited for some sensible comments asking some basic questions about how the service was planned and how it was controlled on a day by day basis but none came. I waited in vain for a proper analysis of the issues and solutions but there were none. So I’ve decided to break my silence and offer some basic ideas, based on my own experience of timetable preparation in various places around the world and of train service operations.The Routes
The Thameslink routes are too complex. The old setup with a Bedford to Brighton main line with the Sutton loop tacked on was quite complex enough, without adding such destinations as Peterborough and Cambridge in the north and Orpington, Sevenoaks, Horsham, Rainham, Littlehampton and East Grinstead in the south. In the originally planned December 2019 timetable, they were going to add Kings Lynn and Ashford too. This would not work well.Saturday, 24 October 2026
Battery-Electric Trains
Why Battery Electric?
Unlike a conventional electric train, a battery-electric train can operate without a continuous overhead wire or electrified third rail. It can replace a conventional diesel train, on a route without electrification. Full electrification is very expensive. It can cost up to £2 million per track kilometre. Being able to use a train with a battery offers the opportunity to decarbonise the railway without the expense overhead electrification. Battery electric trains need a rapid charging system but this can be provided at a terminus so the train can recharge while it's waiting for its next trip.
A diagram of the trial on the Great Western Railway using a former London Underground D Stock train as a battery electric multiple unit (BEMU). The recharging system uses track mounted rails to recharge the train rather than an overhead supply. Photo: GWR.
Challenges

In general terms, the engineering challenge is to ensure that the train has sufficient energy, power, range, acceleration and braking capability while remaining safe, reliable, maintainable and economical throughout its service life. For BEMUs, the jury is still out. They haven't been around long enough to see a whole life. However, the signs are promising with every increasing improvements in battery life and recharge ability.
Progress
BEMU trains first appeared in passenger service in Germany in 2020. They arrived after a long gestation period, but they pointed the way ahead. In the UK in February 2015, a battery-fitted Class 379 Electrostar unit began in trials on the Harwich branch. This was the first battery-powered train in the UK. It ran on battery power up to 77 kms.
Some serious experiments began with the conversion of some former London Underground district line trains, known as D stock and now designated Class 230, that were converted for battery operation. Although a few are in use around the country, the conversion is expensive and the reliability is poor. Conversion of old equipment is always difficult. New builds have proved to be better.